
New Resource Planning.
Transmission Planning, current year- future(s).
Capacity Planning.
Keywords: GADS, Generator Availability Data, Import, PowerGADS, Resource Adequacy, Planning
Types of data imported to MISO PowerGads system.
550 view(s)
Nov 25, 2025
Keywords: GADS, Generator Availability, Add, PowerGADS, GVTC, Capacity, Resource Adequacy, Planning
Generation Resources greater than or equal to 10 MW (based on Generation Verification Tested Capacity (GVTC)) must submit their Generator Availability Data
145 view(s)
Nov 25, 2025
Keywords: GADS, Generator Availability, Reporting, Timeline, Resource Adequacy, Planning
GADS data must be submitted on a quarterly basis.
477 view(s)
Nov 25, 2025
Keywords: GADS, Generator Availability Data, PowerGADS, Unlock, Resource Adequacy, Planning, Capacity
PowerGADS data entry is locked after the submission deadline has passed.
754 view(s)
Nov 25, 2025
Keywords: GVTC, Generator Verification Test, Correction, Resource Adequacy, Planning
Corrections for Air Temperature, Relative Humidity and Cooling Water Temperature are applied based on unit type.
1638 view(s)
Nov 25, 2025
Keywords: GVTC, Generator, Verification, Test, Capacity, Resource Adequacy, Planning, Summer, Peak, Planning
Brief description of GVTC value and location of summer peak date and time.
2432 view(s)
Jul 7, 2025
Keywords: PRMR, Calculated, Calculation, Planning Reserve Margin, Local Resource Zone, Planning, Resource Adequacy
Planning Resources are maintained for each Local Resource Zone (LRZ) to meet the MISO footprint’s Planning Reserve Margin Requirement (PRMR).
1369 view(s)
Jul 7, 2025
Keywords: ICAP, Defer, Deferral, Credit Requirement, Resource Adequacy, Planning, Auction, Request
MISO will adjust the Market Participant’s credit requirements within ten (10) Business Days of the full ICAP being met and validated by MISO.
736 view(s)
Jul 7, 2025
Keywords: ICAP, Installed Capacity, Defer, Deferral, Planning Resource Auction, Zonal Resource Credit, Resource Adequacy
ICAP Deferrals allow Market Participants (MPs) to participate in the Planning Resource Auction (PRA) using Zonal Resource Credits (ZRCs) that meet defined
1055 view(s)
Jul 7, 2025
Keywords: LCR, Local Clearing, Local Resource Zone, LRZ, Resource Adequacy, Planning
MISO will determine the import and export limits for each Local Resource Zone (LRZ) by performing a transfer analysis study.
2001 view(s)
Jul 7, 2025
Keywords: LRZ, Local Resource Zone, Planning, Demand, Loss of Load, Resource Adequacy
Describes LRZ purpose, how they are determined and details.
7981 view(s)
Jul 7, 2025
Keywords: Resource Adequacy, Planning Resources, Local Clearing Requirement, Local Resource Zone, LRZ, LSE, Planning Reserve Margin Requirement, PRMR
A sufficient volume of Planning Resources must be located in the same LRZ as the LSE's PRMR to meet the LRZ's LCR
410 view(s)
Jul 7, 2025
Keywords: Planning Reserve Margin Requirement, PRMR, Zonal Resource Credit, Resource Adequacy, Planning
Each Load Serving Entity’s (LSE’s) total obligation will be referred to as the Planning Reserve Margin Requirement (PRMR).
4768 view(s)
Jul 7, 2025
Keywords: PRA, RA, Planning, Auction, LRZ, Load Reserve Zone
MISO’s PRA mechanics provide LSEs in MISO an option to procure Planning Resources through an annual auction process known as the Planning Resource Auction
3003 view(s)
Jul 7, 2025
Keywords: Non-Coincident Peak, Submit, Load Forecast, Resource Adequacy, Planning, Summer, Winter, Seasonal
Market Participants serving load within MISO must submit a Non-Coincident Peak Load forecast(s) each year by midnight November 1st.
474 view(s)
Jul 7, 2025
Keywords: Submit, Energy, Load Forecast, Resource Adequacy, Planning Year, Peak Load, Seasonal, MECT, Module E
Market Participants serving load within MISO must submit an Energy For Load forecast(s) each year by midnight November 1.
658 view(s)
Jul 7, 2025
Keywords: Peak, Load Forecast, Submit, Resource Adequacy, Coincident Peak, Planning Year
Market Participants serving load within MISO must submit a Coincident Peak Load forecast(s) each year by midnight November 1
763 view(s)
Jul 7, 2025
Keywords: Zonal, Deliverability, ZDB, Resource Adequacy, Local Resource, LRZ, External Resource, ERZ, Sub-Regional, SRRZ, Planning, Auction
Price separation between Local Resource Zones (LRZs), External Resource Zones (ERZs), or groupings of LRZs, including Sub-Regional Resource Zone (SRRZs)
4862 view(s)
May 6, 2025
Keywords: Appendix H, MISO functional control, Transmission Facilities, above 100kV, transferred
Appendix H Transmission System Facilities is a listing of facilities a Transmission Owner has transferred to MISO for the purpose of planning and operation
1335 view(s)
May 2, 2025
Keywords: Appendix G, Non-transferred Transmission Facilities, Agency Agreement, 100kV and below
Appendix G Agency Agreement is used for Non-Transferred Transmission Facilities which are transmission facilities that have not been transferred to MISO.
1191 view(s)
May 2, 2025
Keywords: Applications, Model-On-Demand, ShareFile, Access, MTEP, ShareFile, PROMOD, BAC, CSVLR, TOCTT, 881, MUG, OPSUG, RASUG, RCCTT, ROWG, WAMSUG, Flowgate, Generation Interconnection, Member Drills, Reliability Authority, Restricted, Access
Extranet, Citrix, Member Delivered Applications, Model-On-Demand, ShareFile, Access
21998 view(s)
Nov 25, 2025