Keywords: LMR, Load Modifying Resource, Behind the Meter, Demand Resource, Resource Adequacy, Planning, Module E, Module E-1
emand Response (DR) Testing Requirements
926 view(s)
Jan 10, 2025
Keywords: XEFORd, GADS, Generator Data, Resource Adequacy, Planning, Forced Outage,
Defines and describes XEFORd (Equivalent Forced Outage Rate Demand)
451 view(s)
Jan 10, 2025
Keywords: ZRC, Zonal Resource Credit, Resource Adequacy, Transfer, Exchange, Resource Adequacy
Zonal Resource Credit (ZRC) transactions allow two Market Participants to exchange Zonal Resource Credits (ZRCs).
1677 view(s)
Dec 4, 2024
Keywords: Fixed Resource Adequacy, Plan, Planning, FRAP, Resource Adequacy, Planning Reserve Margin, Local Clearing, Local Resource, Submit
Describes the Fixed Resource Adequacy Plan requirements.
1494 view(s)
Jan 10, 2025
Keywords: Fixed Resource, FRAP, Zonal Resource Credit, ZRC, Resource Adequacy, Planning, Reserve Margin, Local Clearing, Local Resource
Describes the Fixed Resource Adequacy Plan
1122 view(s)
Jan 10, 2025
Keywords: GADS, Generator Availability Data, Import, PowerGADS, Resource Adequacy, Planning
Types of data imported to MISO PowerGads system.
223 view(s)
Jan 10, 2025
Keywords: GADS, Generator Availability, Add, PowerGADS, GVTC, Capacity, Resource Adequacy, Planning
Generation Resources greater than or equal to 10 MW (based on Generation Verification Tested Capacity (GVTC)) must submit their Generator Availability Data
82 view(s)
Feb 6, 2025
Keywords: GADS, Generator Availability, Reporting, Timeline, Resource Adequacy, Planning
GADS data must be submitted on a quarterly basis.
163 view(s)
Jan 10, 2025
Keywords: GADS, Generator Availability Data, PowerGADS, Unlock, Resource Adequacy, Planning, Capacity
PowerGADS data entry is locked after the submission deadline has passed.
506 view(s)
Feb 6, 2025
Keywords: GVTC, Generator Verification Test, Correction, Resource Adequacy, Planning
Corrections for Air Temperature, Relative Humidity and Cooling Water Temperature are applied based on unit type.
894 view(s)
Dec 4, 2024
Keywords: GVTC, Generator, Verification, Test, Capacity, Resource Adequacy, Planning, Summer, Peak, Planning
Brief description of GVTC value and location of summer peak date and time.
1416 view(s)
Jul 1, 2024
Keywords: PRMR, Calculated, Calculation, Planning Reserve Margin, Local Resource Zone, Planning, Resource Adequacy
Planning Resources are maintained for each Local Resource Zone (LRZ) to meet the MISO footprint’s Planning Reserve Margin Requirement (PRMR).
744 view(s)
Jul 1, 2024
Keywords: ICAP, Defer, Deferral, Credit Requirement, Resource Adequacy, Planning, Auction, Request
MISO will adjust the Market Participant’s credit requirements within ten (10) Business Days of the full ICAP being met and validated by MISO.
442 view(s)
Jul 1, 2024
Keywords: ICAP, Installed Capacity, Defer, Deferral, Planning Resource Auction, Zonal Resource Credit, Resource Adequacy
ICAP Deferrals allow Market Participants (MPs) to participate in the Planning Resource Auction (PRA) using Zonal Resource Credits (ZRCs) that meet defined
677 view(s)
Jul 1, 2024
Keywords: LCR, Local Clearing, Local Resource Zone, LRZ, Resource Adequacy, Planning
MISO will determine the import and export limits for each Local Resource Zone (LRZ) by performing a transfer analysis study.
1415 view(s)
Jun 3, 2024
Keywords: LRZ, Local Resource Zone, Planning, Demand, Loss of Load, Resource Adequacy
Describes LRZ purpose, how they are determined and details.
5320 view(s)
Jul 1, 2024
Keywords: Resource Adequacy, Planning Resources, Local Clearing Requirement, Local Resource Zone, LRZ, LSE, Planning Reserve Margin Requirement, PRMR
A sufficient volume of Planning Resources must be located in the same LRZ as the LSE's PRMR to meet the LRZ's LCR
255 view(s)
Jul 1, 2024
Keywords: DSRI, Demand Side Resource Interface, Monthly Availability, LMR, Load Modifying Resource, MWs Available for MISO, Self-Scheduled MWs, ZRC, Zonal Resource Credits, PRA, MECT, Module E, Resource Adequacy, Planning
Load Modifying Resource (LMR) Availability Data
974 view(s)
Jun 3, 2024
Keywords: Planning Reserve Margin Requirement, PRMR, Zonal Resource Credit, Resource Adequacy, Planning
Each Load Serving Entity’s (LSE’s) total obligation will be referred to as the Planning Reserve Margin Requirement (PRMR).
3029 view(s)
Jul 1, 2024
Keywords: PRA, RA, Planning, Auction, LRZ, Load Reserve Zone
MISO’s PRA mechanics provide LSEs in MISO an option to procure Planning Resources through an annual auction process known as the Planning Resource Auction
2072 view(s)
Jul 1, 2024
Keywords: Utility, Commissioner, Regulatory, State, Regulator, RERRA, Resource Adequacy, Utilities, State, Electric, Retail, Authority
Describes the role and authority of state utility commissions and Relevant Electric Retail Regulatory Authorities (RERRA) in MISO’s Resource Adequacy.
485 view(s)
Jun 3, 2024
Keywords: Non-Coincident Peak, Submit, Load Forecast, Resource Adequacy, Planning, Summer, Winter, Seasonal
Market Participants serving load within MISO must submit a Non-Coincident Peak Load forecast(s) each year by midnight November 1st.
284 view(s)
Jun 3, 2024
Keywords: Submit, Energy, Load Forecast, Resource Adequacy, Planning Year, Peak Load, Seasonal, MECT, Module E
Market Participants serving load within MISO must submit an Energy For Load forecast(s) each year by midnight November 1.
355 view(s)
Jun 3, 2024
Keywords: Peak, Load Forecast, Submit, Resource Adequacy, Coincident Peak, Planning Year
Market Participants serving load within MISO must submit a Coincident Peak Load forecast(s) each year by midnight November 1
538 view(s)
Jul 1, 2024
Keywords: Zonal, Deliverability, ZDB, Resource Adequacy, Local Resource, LRZ, External Resource, ERZ, Sub-Regional, SRRZ, Planning, Auction
Price separation between Local Resource Zones (LRZs), External Resource Zones (ERZs), or groupings of LRZs, including Sub-Regional Resource Zone (SRRZs)
2894 view(s)
May 7, 2024
Keywords: PRA, Steps, Resource, Participate
An overview of steps required for a resource to participate in an upcoming PRA
534 view(s)
Jul 1, 2024
Keywords: Resource Adequacy, PRA, Capacity, Market, ZRC, Zonal Resource Credit, Reserves, Energy, Contracts, Bilateral, Replacement
Accessing the Non-MISO Transaction Bulletin Board
763 view(s)
Dec 20, 2024
Keywords: Resource Adequacy, ESR, Electric Storage Resource, electric storage, battery, battery storage
FAQs for Electric Storage Resource implementation
5559 view(s)
Jul 22, 2024
Keywords: ESR, Resource Adequacy, Electric Storage Resource
Information on how to get started with providing Electric Storage Resource(ESR) in the market.
2190 view(s)
Apr 1, 2024
Keywords: PowerGADS, GVTC, Net Capacity
Tips for Seasonal MISO Net Capacity Verification Test or GVTC
1669 view(s)
May 29, 2024
Keywords: Resource Adequacy, PowerGADS, GADs, GVTC, CCE, SAC, RAN
How to access the CCE Environment for PowerGADS
440 view(s)
Jan 10, 2025
Keywords: MECT, SAC, CCE, RA, Resource Adequacy
Instructions for access MECT in the CCE
455 view(s)
Oct 28, 2024
Keywords: PowerGADS, GVTC, Net Capacity, Generator Availability Test Data
How to Access and Use PowerGADS
1012 view(s)
Nov 12, 2024
Keywords: RAN, RA, Resource Adequacy, RA Hours, ISAC, SAC, Schedule 53, PRA Timeline
Frequently Asked Questions
14422 view(s)
Dec 16, 2024
Keywords: SAC, MECT, RA, DATA
Instructions on how to get your Seasonal Accredited Data that was used to calculate unit SAC values.
291 view(s)
Dec 2, 2024
Keywords: SAC, RAN. RA, ICAP, Schedule 53 Resources
Two scenarios of what happens when Schedule 53 Resources SAC is greater than ICAP.
355 view(s)
Jul 1, 2024
Keywords: Resource Adequacy, SAC, ERIS, ZRC
How to Convert Seasonal Accredited Capacity (SAC) associated with Energy Resource Service (ERIS) into Zonal Resource Credits (ZRC)
1794 view(s)
Jan 2, 2025
Keywords: Resource Adequacy, Submit Retail Choice Switching
How to Submit Retail Choice Switching
206 view(s)
Feb 1, 2024
Keywords: Resource Adequacy, OMS, OMS Survey,
How to Submit the MISO-OMS Survey
903 view(s)
Mar 13, 2024
Keywords: Resource Adequacy, Emergency Notification, Load Shedding
Location of emergency notification and load shedding protocol
212 view(s)
May 6, 2024
Keywords: Capacity Replacement Non-Compliance Charge, CRNCC, CROW, Outages, derates, ZRCs,
This knowledge article answers frequent questions regarding Capacity Replacement Non-Compliance Charge, CROW tickets and Derates.
1399 view(s)
Dec 10, 2024
Keywords: Resource Adequacy, Hedge, HUC, Historical, Price Separation, Financial Hedge, ZDB, Zonal Deliverability Benefit, Resource Zone, FAQ, Scenario
Additional information around HUC and how they work within a Planning Resource Auction.
85 view(s)
Jun 12, 2024
Keywords: Resource Adequacy, PowerGADs, GADS, Upgrade, CCE
Information about upgraded PowerGADS 4.0 in the CCE Environment.
414 view(s)
Nov 5, 2024