Knowledge Articles

  • Dispatchable Intermittent Resource (DIR) Setpoint Values

    Description: DIR setpoints are determined in the Real-Time Unit Dispatch System (RT UDS).

    Keywords: DIR, Dispatchable, Intermittent Resource, Setpoint, Dispatch Target

    Views: 45

    Rating:

    Published On: Jan 5, 2021

  • Fast Ramp Resource Offer

    Description: Fast Ramp Resource offer applies only to Real-Time and not Day-Ahead

    Keywords: DA, Day Ahead, Resource Offer, Fast Ramp, Ramp, RT, Real Time

    Views: 6

    Rating:

    Published On: Jan 14, 2021

  • Generation Resource Operation Timeline

    Description: Minimum Down and Minimum Run time are determined by the Resource (Unit) Owner and are part of the Unit Operating Parameters.

    Keywords: Minimum Down, Minimum Run, Resource, Unit, Owner, Unit Operating Parameters.

    Views: 17

    Rating:

    Published On: Jan 5, 2021

  • Minimum Run Time

    Description: Minimum Run Time for Resources within MISO

    Keywords: Minimum Run, Min Run, Resource, Generator, Online, Scheduled, Start, Sync

    Views: 34

    Rating:

    Published On: Jan 5, 2021

  • Resource Operating Control Modes

    Description: Resource Operating Control Mode

    Keywords: Resource, Operating, Control Mode, Generator, Unit

    Views: 38

    Rating:

    Published On: Jan 5, 2021

  • When Resources Come Online – Dispatch Targets

    Description: Prerequisites for the UDS to consider a Resource as Online

    Keywords: Online, Resource, Generator, Unit, Dispatch, Target, Breaker, Closed, UDS, MW, Quick Start, SCED

    Views: 45

    Rating:

    Published On: Jan 14, 2021

  • Short Term Reserve Fast Facts - Primer

    Description: STR is a 30 minute reserve product in MISO's Market

    Keywords: STR, Short Term Reserve, Primer, FAQ, Frequently Asked Questions, ASM

    Views: 116

    Rating:

    Published On: Jul 22, 2021

  • MCS Notifications, Alert, Warning, Event

    Description: MCS email distributions

    Keywords: MCS, email, exploder, PROFILE, subscription, Event, Alert, Warning

    Views: 43

    Rating:

    Published On: Jun 30, 2021

  • Maximum Generation Emergency Procedure

    Description: Energy Emergency Alerts (EEA) Steps

    Keywords: Max Gen, Alert, Warning, Event, Step, EEA, Energy Emergency Alerts, EOP,NERC

    Views: 25

    Rating:

    Published On: Aug 3, 2021

  • Interchange Schedule Creation for non-OATI Users

    Description: XML code examples needed to include for Interchange requests.

    Keywords: Interchange, E-tag, Day-Ahead, Attachment E, tagging, e-tag

    Views: 26

    Rating:

    Published On: Aug 4, 2021

  • DSRI timetable and API

    Description: What changes are necessary to existing applications that populate the MCS LMR Availability/Self Scheduled screen via API in order to work with DSRI?

    Keywords: MCS, LMR, BTMG, Availability,Demand Side Resource Interface

    Views: 2

    Rating:

    Published On: Oct 29, 2021

  • MUI 2.0 Generator START & STOP

    Description: I can view everything else in the MUI 2.0. Just the Start/Stop orders are not showing up.

    Keywords: notification, MUI 2.0, MUI, API, UI, FAQ

    Views: 4

    Rating:

    Published On: Nov 19, 2021

  • AD HOC Transfer for ICCP

    Description: MISO has indicative dates for ICCP transfers

    Keywords: ICCP, adhoc,wan,scada

    Views: 2

    Rating:

    Published On: Nov 19, 2021

  • GENERATOR RETURN FROM OUTAGE PROCEDURES

    Description: Procedure to return a Generator back to service from an Outage

    Keywords: Crow,outage,run, must run,start

    Views: 0

    Rating:

    Published On: Nov 19, 2021