The unit would need R-COMP Start (Run by Company Start)
This is a Must-Run type of start instruction issued to an MP to be dispatched by the UDS.
*if just offering MR (Must Run) and that means that the resource is committed. There wasn't a R-Comp start, thus the LAC errors
This is a Must-Run type of start instruction issued to an MP to be dispatched by the UDS.
*if just offering MR (Must Run) and that means that the resource is committed. There wasn't a R-Comp start, thus the LAC errors
3 options (maybe number 3 is a good option?), they can either:
- Change commit status as OU and not get a start,
- Change commit status as EC and not get a start, or
- Keep the commit status as MR and get a start
*If option 3 and get a start, their offered MWs need to reflect what the unit is doing.