Views:

After a Load Modifying Resource Deployment a task will be created in the Demand Response Tool (DRT) for meter data submittals.

Section 4 of Attachment TT of MISO Tariff states: 

“A Market Participant representing an LMR must provide to the Transmission Provider hourly meter data for all Hours for the 15 Days prior to the event date, the event day, and 15 Days after the event date, within 53 Calendar Days from the event date.” 

Entities that need to submit meter data should reference the files and instructions located in the zip file Markets and Operations>Demand Response>Demand Response Tool Data Submission zip. Markets and Operations.

Graphical user interface, text, application, email<br><br>AI-generated content may be incorrect.
 

Demand Response Tool is found on the MISO Portal.  Local Security Administrator (LSA) can provision access to users as needed.