Views:


SCHEDULE 2 - REACTIVE SUPPLY AND VOLTAGE CONTROL

Change the amount of an existing Schedule 2 revenue requirement


QUESTION

I currently receive Schedule 2 compensation, but I need to change the revenue requirement.  How do I do that using the Help Center?


SOLUTION

  1. A change to an existing Schedule 2 revenue requirement requires a filing directly with FERC by a representative of the generation resource.  The FERC filing should be made before opening a case in the Help Center.  The representative of the generation resource must notify MISO at the time the time the filing is made and when it is approved or accepted by FERC with copies emailed to misolegal@misoenergy.org . 

 

  1. The Market Participant that represents the generation resource for Schedule 2 compensation should open TWO cases in the Help Center – one case to terminate the existing revenue requirement, and a second case to establish the new revenue requirement.
    1. To Terminate the existing revenue requirement, please refer to Knowledge Article “I need to terminate Schedule 2 revenue” for instructions.
    2. To Add the new revenue requirement, please refer to Knowledge Article “I need to add Schedule 2 revenue” for instructions.




The Schedule 2 Tariff can be accessed here:  https://www.misoenergy.org/legal/tariff/